Call us for a free quote
Every industry has its own language. Office furniture is no exception. And for a first-time buyer, walking into an office furniture project can feel a little like walking into a room where everyone else is already mid-conversation and nobody has stopped to fill you in.
Nobody sets out to make it confusing. The terms exist because they are useful once you know them. The problem is that most buyers never get a chance to learn them in a low-pressure moment. They pick them up mid-project, usually right when a decision has to be made and nobody has time to explain.
This is that low-pressure moment. Fifteen terms every office furniture buyer should know before the first real meeting.
The category that covers desks, credenzas, hutches, and executive-office furniture. Basically anything with a wood or laminate surface that stores things or supports a work surface. When your project team talks about specifying casegoods, they are talking about the executive and workstation furniture, not the seating or the conference tables.
The catchall for cubicles and modular workstation systems. Panels, work surfaces, storage, and electrical raceways that all snap together to form the open-plan area of the office. Systems furniture is engineered as a kit, which is why it takes longer to spec and install than freestanding furniture.
The industry term for office chairs. Task seating is engineered for eight hours of continuous use, which is very different from what a residential chair is engineered for. When you see task seating in a spec, know that it means chairs meant to be sat in all day, every day, for years.
The number of weeks between when your order is placed and when it arrives at the warehouse. Most quality office furniture runs a 10 to 16 week lead time. This is why furniture orders should be placed well before the build-out is complete, not after.
A program most manufacturers offer for a limited product line that ships in a compressed timeframe, typically two to four weeks. QuickShip usually means fewer finish options and fewer configuration choices, but for a late lease signing or a fast growth phase, it can save a project.
Customer’s Own Material. A term used when the client is supplying a specific fabric or upholstery that is not part of the manufacturer’s standard offering. COM is common for high-end reception areas and executive offices where the design intent requires a specific look.
The federal government’s pre-negotiated contract vehicle for procurement. Furniture manufacturers on the GSA Schedule have already been vetted, priced, and cleared for federal agency purchases. If you are buying for a government client, GSA compliance is not optional.
A physical measurement of the space by the furniture dealer or installer, taken after construction but before install. Floor plans are one thing. What actually exists on the floor is another. The field measure catches the difference before it becomes a problem.
The building blocks of every cubicle installation. Panels come in different heights, thicknesses, and fabric options, and together they define the entire open-plan area of the office. Panel selection drives sight lines, acoustic performance, cable routing, and worker privacy. Understanding panels is what turns a systems furniture conversation from confusing into productive.
The category assigned to freight based on density, handling, and value. Higher freight class means more expensive shipping. Office furniture typically ships as freight class 175 to 250, and knowing this helps you understand line items you might otherwise skip past on a quote.
The premium method of shipping and installing furniture, where each piece is wrapped in blankets and delivered without cartons. Cleaner install, less debris on site, and better protection for the pieces themselves. Most premium furniture ships blanket wrap by default.
Furniture engineered for commercial use rather than residential. Contract grade covers construction quality, warranty length, cleanability, cold compliance, and safety ratings. If a piece is not labeled contract grade, it is probably not built to survive an office.
The furniture package that outfits a reception area. Typically includes the reception desk, guest seating, side tables, and any built-in millwork. Reception cells often carry a different budget line than the rest of the office because they set the tone for the whole space.
Taking an existing systems furniture installation apart and rebuilding it in a new layout. Growth, team restructuring, or a lease change often trigger a reconfigure. A good furniture partner handles the tear-down, storage, layout change, and reinstall as one project.
The industry certification body, short for the Business and Institutional Furniture Manufacturers Association. When you see BIFMA-certified on a piece, it means it passed durability, safety, and stability testing built for commercial use. If a piece is not BIFMA-certified, it was probably not built for an office.
Fifteen terms that turn a confusing conversation into an informed one. Office furniture is not complicated once the vocabulary makes sense, and the right partner will make sure you never feel like you are being talked around.
Office Furniture Plus has been the guide for buyers on hundreds of projects a year for over 40 years. Whether you are outfitting your first office, refreshing an existing one, or standardizing across multiple locations, we are here to help.